Planning
- Prepare the area where to change the hoofs.
- Stay organised while changing the hoofs.
- Prepare the Perfect Moose high hoofs kit delivered with your Perfect Moose.

Part number xxxx
- Prepare the following tools :



- Wrench.
- Protective cloth.
- Sealing agent.
Safety Considerations
- Plan your lift, know what you are moving and where before lifting.
- Turn off the Perfect Moose.
- Disconnect the mains.
- Disconnect the drain, see : Drain installation
- Shut off the steam supply from the espresso machine.
- Disconnect the steam supply and place the protective cap, see : Installation procedure for steam wand connection.

Procedure
- Gently push the steam wand down until it touches the pitcher holder.

- Place your Perfect Moose upside down on a protective surface.

- Loosen the feet with the wrench meanwhile using the protective cloth to avoid damage and remove them.

- Apply some sealing agent and screw the high feet on by hand.

- Tighten the feet with the wrench meanwhile using the protective cloth to avoid damage.

- Your perfect Moose has high feet now which makes it easy to clean underneath.


